MJM Electric installed new fiber optic and ethernet cable from DCS’s throughout the plant back to the Main Control Panel. We replaced all the backboards and terminal blocks in four cabinets, traced out all control wiring and re-terminated. Loop checks where performed on 450 circuits. MJM Electric installed and wired two speed probes on the steam generator as well as four on the gas turbine. All of the wiring was installed in existing cable tray, rigid conduit or inner duct.