MJM Electric is currently installing close to a mile of concrete duct bank totaling near 30,000’ of PVC conduit at the Duke Suwannee powerhouse in Live Oak Florida. Following Duct Bank installation MJM Electric will be installing two 1500KVA 13.2kv/480 Transformers feeding two new 1500amp services that will provide new power to the site. Once energized, this new gear will feed the site allowing demolition of the existing coal plant that was built in the 1930’s.