Sleep International was recently forced to relocate their manufacturing facility due the growth of their business. With the relocation to a new location Sleep International was able to fit all the equipment that had been spread out in three buildings into just one new building. MJM Electric surveyed all the current equipment being used, and designed an electrical plan to not only serve Sleep Internationals current needs, but also allow for future growth and needs . The new design called for cable tray, new distribution panels and unground wire ways to serve power to over 100 pieces of equipment. Although the power requirements were a challenge, the biggest hurdle was to maintain production throughout the process.