MJM Electric will be installing power and controls to (3) separate TECO facilities for new fueling stations. We will be installing power feeder raceways and wiring for the new power panels for each of the fueling stations. New LED light fixtures will be installed on the new canopies as well as emergency shutdown push buttons for the new pumps. This installation will be a Class 1 Division 2 conduit installation requiring us to install seal-offs on all conduits. We will be coordinating with the camera company for the installation of their equipment and provide any raceway that they may need as part of the CCTV installation.