MJM Electric was contracted by TECO to disconnect and physically remove an existing 250KW generator at the Ruskin TECO facility. As part of this generator replacement project MJM Electric also installed a new 250KW replacement as part of TECO’s Storm Hardening initiative. This project included the rework and reconnection of the existing conduit/wire to the new generator being installed. MJM Electric is proud to be a part of projects like this that while directly helping our customer also helps serve our community by having reliable emergency power for the energy provider in our immediate area.