MJM Electric worked with the customer and Hall Engineering Group to help create the design criteria to install a new 750KW generator at Sleep International. Along with the design, MJM Electric also was tasked with the installation of a new 1200 AMP ATS (Automatic Transfer Switch) and coordination of all the trades involved to facilitate the installation of the generator.