With the expansion Sleep International went through at the beginning of the year, they vacated one of their buildings that was being used for new mattress production. Instead of abandoning the existing building, they turned this building into a new spring manufacturing facility. MJM Electric installed the power to nine top of the line bed spring machines and is the process of designing a new electrical infrastructure for this location to double in size in the fourth quarter of 2019.