TECO Installed a new road from the back of their property to a new road installed by the county. MJM was tasked in installing (2) gate operators, (2) electrical services and the grounding of approximately 3,000 feet of fencing. Along with the gate operators we installed card readers for the gate operators. This project required us to manage several outside subcontractors to bore the conduits from the gate controllers to the main building. We also managed the camera installers for the cameras being installed in the new pedestals and camera poles installed. This project was completed on time and on budget.